Lifecycle Feasibility Study

Client: Industrial production facility with aging heat pump system

Challenge: Should they invest in a repair (£28k) or replace the system (£50k)?

Our Approach:

  • Surveyed system condition and reliability history (Gathered from CAFM)
  • Calculated efficiency deltas between old vs. modern units
  • Collected warranty periods and service intervals for both options
  • Calculated energy and running cost forecasts over 5 years

Outcome:

  • Replacement would reduce monthly energy usage by 22%
  • Manufacturer warranty + maintenance bundle lowered exposure
  • Payback < 3 years versus repair

Result: Client opted for a full system replacement, which we helped specify and procure. Delivering savings and long-term resilience.

Renewables Feasibility Study

Client: Approved premises facility with high energy consumption

Challenge: Evaluate viability of solar PV, BESS, and backup generator for energy efficiency and resilience.

Our Approach:

  • Conducted non-intrusive data logging for 118 hours to capture load, phase balance, and consumption metrics
  • Analysed voltage stability, peak demand, and annual projections
  • Evaluated system options including G98-compliant PV, Li-ion BESS, and diesel generator
  • Calculated financials, CO2 savings, and compliance with BS 7671 and PAS 63100:2024

Outcome:

  • Recommended 11 kWp PV with 7-year payback and 90% self-consumption
  • Suggested 38 kWh BESS for 4-6 hour backup and 67% ROI
  • Identified phase imbalance for 12-15% bill reduction via <£1000 fix

Result: Delivered study in 7 days post-P.O.; client achieved required outcomes plus additional savings from phase correction.

Result: Delivered study in 7 days post-P.O.; client achieved required outcomes plus additional savings from phase correction.